Troutman/Clearmont Realignment

Troutman/Clearmont Realignment

PA100020 - CopyTroutman/Clearmont Realignment

The Troutman Boulevard Utility Relocation and Roadway Realignment project includes the designing, constructing and vacating of approximately one-half mile of Troutman Boulevard, from Franklin Street to Charles Herbert Drive. Improvements include the removal/abandonment and relocation of utilities from Troutman Boulevard to adjacent roadways and easements as well as extending Clearmont Street to Troutman Boulevard. Clearmont Street will be upgraded from a rural divided roadway to an urban divided roadway. Clearmont will be widened to four travel lanes from Palm Bay Road south to the new Troutman Boulevard connection. Sidewalks will also be installed along Clearmont Street from Palm Bay Road south to Troutman Boulevard and along Franklin Street from Troutman Boulevard to Clearmont Street. Additionally, the drainage system will be converted from an open swale to closed culvert system for Clearmont Street from Harris Avenue south to the connection with Troutman Boulevard. This project is scheduled to be completed by Spring 2014.

Project Update Information:

  • February 2014:  Construction continues on the north east end of the project with trench drain installation in the median road reconstruction along the east side of the roadway and driveway removal and reconstruction along the north east side of the project. Curbing work along the south side of Gun Powder drive has been surveyed and is scheduled in the upcoming weeks. The pond construction is mostly completed with only the pond driveway remaining. The contractor will also commence working along Franklin Drive for the new sidewalk to be installed which will connect the east side sidewalk on Clearmont Drive with the west side sidewalk on Troutman Blvd. Attached is the latest project aerial showing the current site conditions and linked are project photos.

Project information:

For questions please contact Hector Franco, P.E. at 321-953-8996.